Efficiency of Material Procurement, Time, and Cost Control in the Canopy Construction Project at RSKD Duren Sawit

Authors

  • Muhammad Naufal Rif'at Universitas Dian Nusantara
  • Reynold Andika Pratama Universitas Dian Nusantara

DOI:

https://doi.org/10.69693/jesa.v3i2.44

Keywords:

Material Procurement, Earned Value Analysis, Critical Path Method, Cost Performance Index, Schedule Performance Index

Abstract

Material procurement plays a critical role in determining the cost and schedule performance of hospital-based construction projects, where limited storage space and active medical operations constrain logistics. This study evaluates the efficiency of the material procurement system and its relationship with cost and time performance in the canopy construction project at RSKD Duren Sawit, East Jakarta. A descriptive quantitative case study approach was applied, combining field observation, structured interviews, and secondary project documents (purchase orders, bill of quantity, budget plan, and weekly progress reports). Cost and schedule performance were analyzed using Earned Value Analysis (EVA), while the Critical Path Method (CPM) was used to identify the activities controlling total project duration. The results show a Cost Performance Index (CPI) of 1.316 and a Schedule Performance Index (SPI) of 1.071 at week 10, indicating that the project was completed under budget and ahead of schedule, with an estimated cost saving of approximately IDR 461 million against the total budget. CPM analysis identified the motorcycle parking canopy works as the critical path, with zero float, while the ICU canopy works and K3 (occupational safety) activities had considerable float (30-75 days). Procurement efficiency was found to be influenced by accurate material volume planning, effective vendor price negotiation, Just-in-Time (JIT) delivery scheduling adapted to hospital operating hours, and strict incoming-material quality control. These findings provide a practical reference for managing material procurement in construction projects located within active healthcare facilities.

Downloads

Download data is not yet available.

References

[1] W. Ervianto, Manajemen Proyek Konstruksi. Yogyakarta, Indonesia: Penerbit Andi, 2005.

[2] I. Soeharto, Manajemen Proyek: Dari Konseptual sampai Operasional. Jakarta, Indonesia: Erlangga, 1997.

[3] H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 12th ed. Hoboken, NJ, USA: Wiley, 2017.

[4] Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7th ed. Newtown Square, PA, USA: PMI, 2021.

[5] R. Indriani, B. Utomo, and A. Rizqy, "Analisis kinerja waktu dan biaya proyek konstruksi dengan metode Earned Value Analysis," 2022.

[6] N. Mahapatni, I. Putra, and I. Murwanta, "Analisis kinerja waktu dan biaya pelaksanaan proyek dengan metode Earned Value pada proyek pembangunan Jembatan Pangkung Dalem ruas jalan Gitgit-Wanagiri," 2022.

[7] Perdana and D. Widjajakusuma, "Evaluasi kinerja dengan penerapan metode Earned Value Analysis terhadap waktu dan biaya proyek (studi kasus gedung showroom mobil mewah di Jakarta)," 2022.

[8] Erik, M. Rodhi, A. Saputra, and M. Sholahuddin, "Evaluasi kinerja biaya dan waktu pada proyek jembatan menggunakan metode Earned Value (studi kasus: rehabilitasi Jembatan Ngaglik Kedungadem-Kepohkidul, Kabupaten Bojonegoro)," 2025.

[9] F. Tanubrata and Trisyandi, "Evaluasi pengadaan bahan konstruksi pada proyek Rumah Sakit Unggul Karsa Medika," 2017.

[10] M. Proano-Narvaez, C. Flores-Vazquez, P. Vasquez Quiroz, and M. Avila-Calle, "Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections," Buildings, vol. 12, no. 3, p. 301, 2022.

[11] M. A. Eirgash, "Earned Value Analysis for Construction Projects Using Project Management Scheduling Engine," American Journal of Civil Engineering, vol. 7, no. 5, pp. 121-125, 2019.

[12] M. Lu, J. Liu, and W. Ji, "Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis," International Journal of Construction Management, vol. 17, no. 4, pp. 293-310, 2017.

[13] Project Management Institute, "Critical Path Method Calculations," PMI.org, 2016. [Online]. Available: https://www.pmi.org/learning/library/critical-path-method-calculations-scheduling-8040

[14] L. Kong, H. Li, H. Luo, L. Ding, and X. Zhang, "Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction," Journal of Cleaner Production, vol. 193, pp. 684-701, 2018.

[15] R. Vrijhoef and L. Koskela, "Roles of Supply Chain Management in Construction," in Proc. 7th Annual Conf. of the International Group for Lean Construction (IGLC-7), Berkeley, CA, USA, 1999, pp. 133-146.

[16] T. Riso, "Earned Value Analysis in Construction: Understanding the Intersection of Cost, Schedule and Scope," Procore, 2025. [Online]. Available: https://www.procore.com/library/earned-value-analysis-construction

[17] Procore, "Hospital Construction: Managing Unique Challenges in Healthcare," Procore, 2025. [Online]. Available: https://www.procore.com/library/hospital-construction

[18] Oracle NetSuite, "The Complete Guide to Construction Procurement," NetSuite.com, 2025. [Online]. Available: https://www.netsuite.com/portal/resource/articles/erp/construction-material-procurement.shtml

Downloads

Published

13-08-2026

How to Cite

Rif’at, M. N., & Pratama, R. A. (2026). Efficiency of Material Procurement, Time, and Cost Control in the Canopy Construction Project at RSKD Duren Sawit. Journal of Engineering and Science Application, 3(2), 49–56. https://doi.org/10.69693/jesa.v3i2.44

Issue

Section

Articles